What we do in Chislehurst

What the Article 4 direction allows

How we run a job in Chislehurst
Questions we get in Chislehurst
Can I convert my loft in Chislehurst without planning permission?
It depends on one line on a map. Inside the Chislehurst conservation area, permitted development for roof additions such as a dormer is removed, so a dormer needs a planning application. Rooflights are treated separately and are usually still allowed, though not on a roof slope that fronts a highway. Outside the conservation area, a rear dormer within the volume limits normally goes ahead without an application. We check your address before quoting, because it changes both the timescale and the cost.
Does Bromley’s Article 4 direction affect Chislehurst?
Yes. Chislehurst ward is one of the areas named in the direction that removes the permitted development right to add up to two storeys. So adding a full storey here means a planning application. It does not stop you converting the roof space you already have, which is a different right and the one most people actually want.
I read about an Article 4 direction for Chislehurst Road. Does that apply to me?
Almost certainly not. The roof-alterations direction that took effect on 19 July 2022 covers the Chislehurst Road conservation area, and Chislehurst Road is in Petts Wood rather than in Chislehurst. It is an easy one to find online and misread, so we check the actual boundary rather than the name.
Is my house in the Chislehurst conservation area?
It may well be. The Chislehurst conservation area was designated on 1 January 1971 and covers a large part of the town. Mavelstone Road in Bickley, Sundridge Avenue and Chislehurst Road in Petts Wood are the nearest others. Bromley has 47 conservation areas in total. We look your address up on the register before anything is drawn.
What does a skip cost in Bromley?
The council’s permit is £50 for fourteen days and they ask for two working days to process it. That is on top of the skip hire itself, and all of it goes in the quote rather than appearing later.
How long does a loft conversion take?
Design and approvals typically add eight to sixteen weeks before anyone is on site, and longer if a planning application is needed rather than permitted development. The build itself is usually eight to twelve weeks for a dormer conversion. You get the programme in writing before we start.